Walker recycles!

Don't forget to save your plastic, your paper and your aluminum cans. There's now a recycling bin available 24/7 behind the Walker Municipal Building, 10136 Florida Boulevard.

Read more

 

Search all our sites

Can't find what you're looking for? Search all of the City of Walker's websites. Just enter your search term below and click "search."

 

Loading

 

Our free newsletter

Keep up with all the latest happenings in the City of Walker. Subscribe for free to The Walker Report, delivered right to your Inbox.

Subscribe

Read the current issue

Archives


Follow us on Facebook, Twitter
& About Me

Join our 2,000+ fans on Facebook or our followers on Twitter. Browse through our photo albums and get up-to-the-minute updates on happenings in our hometown. Or check out our profile on about.me. Click the images below to start.

City of Walker on Facebook City of Walker on Twitter City of Walker on about.me


Get news on the go

Text follow CityofWalker to 40404 to get text alerts on your cell phone. Please note: Standard messaging rates apply.


Up & coming events

>>Now through February 28
Registration for Walker Parks & Recreation TBall, Baseball & Softball

>>February 4
Mardi Gras Parade

>>February 13
Planning & Zoning meeting

>>February 13
City Council meeting

>>March 12
Planning & Zoning meeting

>>March 12
City Council meeting

>>April 12
March of Dimes March for Babies in Sidney Hutchinson Park

>>July 30
CityFest


Walker Works



We're connecting Walker's workforce with Livingston Parish businesses. Companies in our community can list career opportunities, and job seekers can search for employment closer to home. It's totally free.

Read more

For contractors: Acquiring
residential construction permits


Permits & Inspections
Walker Municipal Building
10136 Florida Boulevard
Walker, LA 70785

Phone: 225.665.8893

Hours
7 a.m. to 5:30 p.m.
Monday through Thursday

 

All contractors doing business in the City of Walker must have a City of Walker contractor's license. For instructions on applying for a license, click here. For a license application, click here.

Building permit application process

Builders must supply the following construction documents to the City of Walker:

1. House plans
2. A plat showing the location of the house
3. A completed Building Permit application. To obtain one online, click here.
4. A Flood Elevation Certificate, which can be obtained from a surveyor of your choosing. Two will be needed to obtain a Certificate of Occupancy. These include:

» Building Under Construction Elevation Certificate
» Finished Construction Elevation Certificate

Once those materials have been submitted, the construction documents are in the plan review stage. The Permit Department will calculate a building permit fee, review the plans for code compliance and generate a plan-review letter at the end of the review. You will be contacted and informed of the permit fee and any plan-review changes that must be made to meet code compliance.

Now that you have a permit

» Permits must be posted on the job site, along with the address and lot number.
» Electrical, plumbing and mechanical permits are required on all jobs before the rough-in begins.
» Inspections of foundations [including rough-in plumbing] will be done as soon as possible after the call for an inspection.
» A Flood Elevation Certificate is required. A Buidling Under Construction Elevation Certificate must be supplied to this office before construction begins, and the Finished Construction Elevation Certificate must be turned in before a final inspection and Certificate of Occupancy is issued.
» All other inspections, such as electrical, plumbing and mechanical, will be done the same day or the next business working day.
» No inspections will be done without a permit.
» Insulation cannot be installed and walls cannot be sealed without proper passed inspections.
» All jobs are required to have a dumpster for trash and construction debris removal.
» No open burning.
» All jobs are required to have a portable toilet on site.
» Erosion protection shall be installed within the street right-of-way before construction begins.
» A $50 re-inspection fee will be charged when a second trip to a construction site is required due to rejection or lock-out.

Order of inspections

1. Temporary electric pole
2. Rough-in plumbing
3. Foundation
4. Electrical rough in
5. Mechanical rough in
6. Plumbing top out/gas
7. Rough framing
8. Electrical final
9. Plumbing final
10. Mechanical final
11. Sewer tie-in
12. Final framing building [require top-of-floor elevation certificate; issue occupancy certificate]